While we were in soffit mode we decided to use the remaining two lengths of soffit we had from this batch for the underside of the toilet block flat roof, a job that had been on the “to do list” … Continued
The back scaffolding was removed today. As can be seen in some of the images there is some unpainted woodwork. These were areas that we could not access because of the scaffolding so these will be one of the next … Continued
The scaffolding at the front was removed today. It seems a long time since we had seen the front of the school! The white UPVC soffits were an attempt to recreate the look of the boards had been there originally … Continued
The wood was all prepped and filled and treated with preservative and the first grey undercoat applied. Second grey undercoat. First coat of exterior black satin. The second black coat and the first of the UPVC soffits fitted.
Final push and the roof is finished! Now begins the job of prepping the woodwork for painting and adding battens so that UPVC soffit can be attached to the underside of the roof overhang.
Work has continued on slating and replacing rotten woodwork. We are trying to keep as much of the existing detail as possible and replace some of what we know was once there from old photographs and the evidence in the … Continued
Today work started on stripping and replacing the last section of roof. Once again we were lucky and the woodwork was in good condition and only a woodwormed section of beam will need to be chopped out and replaced.
The slating and leadwork continues. We have also started stripping the paint on some of the woodwork in readiness for it being repainted.